TotalEnergies EP Uganda BV
Project operator
A major upstream development north of Lake Albert, bringing together six production licences, approximately 400 wells and the infrastructure required to process up to 190,000 barrels of oil per day.
Tilenga straddles Buliisa and Nwoya districts north of Lake Albert. The project combines three production licences from Contract Area 1 and three from Licence Area 2.
The licences include Jobi-Rii, Gunya, Ngiri, Kasamene-Wahrindi, Kigogole-Ngara and Nsoga. Approximately 400 wells are planned from 31 locations, reducing the development footprint while supplying a central processing facility in Buliisa.
Project operator
Joint venture partner
UNOC participating interest
Tilenga integrates production, processing, water abstraction and supporting infrastructure into a single development system.
Approximately 400 wells drilled from 31 locations across the six production licences.
A 95-kilometre flow line network connects producing areas to the Central Processing Facility.
The CPF at Kasinyi, Nwoya is expected to process crude from production wells.
Infrastructure for water abstraction, feeder lines, construction camps and support bases completes the project system.
Alongside the Environmental and Social Impact Assessment, the project applies a biodiversity action plan structured around the Avoid–Reduce–Compensate principle.
Plan project activity to prevent impacts where practical.
Minimise impacts that cannot be completely avoided.
Address residual impacts through appropriate measures.
Selected project milestones.
Front-End Engineering and Design for the project was completed.
The National Environment Management Authority issued the project’s environmental certificate.
Final Investment Decision was announced alongside Kingfisher and EACOP.
Explore other parts of UNOC’s upstream activities.
A strategic oil development on the southeastern shores of Lake Albert, combining offshore drilling, central processing and a 46-kilometre feeder pipeline designed to deliver up to 40,000 barrels of crude oil per day.

The Kingfisher Development Area is located southeast of Lake Albert in Kikuube District. It is one of Uganda’s key oil and gas developments and includes the Kingfisher field, with provision for future tie-in of the Mputa–Nzizi–Waraga fields.
The development is designed around a Central Processing Facility with capacity for 40,000 barrels of oil per day, 31 wells drilled from four well pads, flowlines linking the field to the CPF, and a feeder pipeline connecting Buhuka to the export hub and refinery at Kabaale, Hoima District.
Kingfisher integrates four well pads, flowlines, a Central Processing Facility, Lake Albert water abstraction and a feeder pipeline into one connected production system.
Thirty-one wells, including 11 injectors and 20 producers, are planned across four well pads.
Nineteen kilometres of flowlines connect the Kingfisher well pads and production areas to the CPF.
The Central Processing Facility is designed for peak processing capacity of 40,000 barrels of crude oil per day.
A 46-kilometre, 12-inch feeder pipeline links the CPF in Buhuka to the export hub and refinery at Kabaale.
Kingfisher combines offshore well development, onshore processing and supporting infrastructure around Lake Albert.
Specialised drilling supports production and injection wells in the Lake Albert development area.
The CPF consolidates field production and prepares crude for onward transportation.
Water abstraction, camps, materials yard, jetty and access roads support project operations.
Front-End Engineering and Design for the Kingfisher Development Area was completed.
The Environmental and Social Impact Assessment was completed and certified by the National Environment Management Authority.
Final Investment Decision was announced alongside Tilenga and the East African Crude Oil Pipeline.
UNOC is building the exploration capability, partnerships and operating experience needed to replace reserves, discover new resources and progress toward long-term independent operatorship.
UNOC acquired a petroleum exploration licence for Kasuruban, an oil and gas block in Western Uganda, following Uganda’s second licensing round. The contract area spans approximately 1,285 square kilometres across Buliisa, Hoima and Masindi districts.
The licence and Production Sharing Agreement give UNOC the opportunity to undertake its first exploration work as a national oil company while building the technical depth required to become an independent operator over the long term.
Exploration & New Ventures combines acreage evaluation, subsurface work, strategic partnerships and institutional capability-building into a pathway toward new petroleum discoveries.
Advance geological and geophysical understanding of the Kasuruban contract area and identify prospective resources.
Use hands-on exploration activity to strengthen UNOC’s subsurface, technical, commercial and project capabilities.
Pursue a reputable joint-venture partner with the technical, financial and operating experience required for exploration.
Translate exploration experience into the long-term national capability required for UNOC to operate petroleum assets independently.
Kasuruban gives UNOC a practical platform to pursue reserves replacement, deepen upstream expertise and build the experience required to take a larger operating role in Uganda’s petroleum sector.
Pursue additional petroleum resources and reserves through disciplined exploration.
Build in-house technical expertise through direct participation in exploration work.
Progress toward UNOC’s long-term strategic goal of independent operatorship.
Kasuruban was among the five blocks announced under Uganda’s second petroleum licensing round.
UNOC signed the Production Sharing Agreement and received the petroleum exploration licence for the Kasuruban contract area.
Undertake exploration work, mature prospects and build the operating experience needed to pursue additional resources.